Those who have been following the California High Speed Rail process will have noticed that there's been quite a lot of recent controversy about the proposed route between San Francisco and San Jose. Leaving aside the propriety of a government authority board member deciding on train service to a station named after himself, there's plenty of worry that the High Speed Rail will bulldoze through towns, destroying homes and leaving huge ugly structures with noisy trains in its wake. Emotions are high on both sides, there's a lot of uncertainty, and not much fact to go on, so arguments are based on differences of assumption, and tend to devolve to name calling. Unfortunately, the High Speed Rail Authority hasn't done nearly enough in the way of planning, mostly because they haven't had money to until now. In particular, I haven't seen pretty much anything in the way of joint planning with Caltrain regarding track sharing, service levels, station design, and improvements to the line. This strikes me as a crucial omission, and I suggest Caltrain and HSRA work together to remedy this at once.

What would a planning process look like? I suggest the following:


  1. Start with ridership forecasts for both Caltrain and HSR. These already exist, the only potential caveat is to not double-count riders when combining them.

  2. Determine a service level that will adequately serve this demand, and make a conceptual service pattern for the line. This has been done on some level for HSR and Caltrain individually, but not jointly

  3. Find the minimal set of improvements to transform the service plan into an actual timetable. This is basically a matter of straightening curves to get sufficient line speed, and providing enough passing tracks to allow express trains to pass locals.

  4. Finally, this process might need to be iterated several times, to account for the fact that ridership is somewhat flexible and it might be much easier to produce a workable timetable if some riders are convinced to move to adjacent stations.


This doesn't seem like it would be that hard. The respective agencies already have ridership forecasts, they just need to combine them and produce a joint service plan, and start devising potential timetables. Caltrain should probably take the lead here, since they own the ROW and will still be the majority operator. And this is something that absolutely needs to get done, to make sure that all the agencies are working with a common set of assumptions. It would be bad if, for example, HSRA was planning for almost exclusive use of two tracks with only occasional incursions by Caltrain Baby Bullets, while Caltrain was planning more significant track sharing, or even a line that wasn't four tracks for the entire length.

Saturday, January 10, 2009

HSRA already in trouble

It's only two months since the bond authorization passed, and the high speed rail authority is already in trouble. They're running low on cash, since the state hasn't managed to sell any of the bonds yet. An interesting, and somewhat disturbing, factoid from that article is that the whole Authority has a staff of 6 employees, wedged uncomfortably between the governing board of 9 politicians, including Quentin Kopp and Rod Diridon, and the vast engineering/construction companies who will presumably be doing all of the design, construction, and project management.

What is Normal Speed Rail?

Those of you who were paying attention to the ballot propositions in California should know that there was a ballot measure authorizing a bond for the construction of a High Speed Rail system from LA to San Francisco. This all-new rail line is estimated to cost $40 billion and promises an end-to-end time of 2 hours and 38 minutes. Sounds great, right?

I am of the opinion that before trying to run, you should learn to walk, and that before attempting as grandiose a project as a high speed rail network, it would make sense to first build out a network of Normal Speed Rail. Normal Speed Rail would reach far more people than HSR, and unlike the current HSR proposal, it could be built incrementally as improvements to existing rail lines.

What do I mean when I speak of Normal Speed Rail? I mean the kind of rail service one sees in other developed countries, as well as in the Northeast Corridor in the US. It means conventional electric trains, running on conventional tracks, with a top speed of 125 mph. This should be the standard for intercity rail service on California's major intecity rail corridors. Only once we have that does it make sense to start working on high speed rail.